So, you’re thinking about getting a fiberglass pool? Great Choice! The sleek, low-maintenance, and best of all, quick installed pools will be the attraction of your backyard.
But how long does it really take to install a fiberglass pool?
The short answer? It depends. Some pool projects finish smoothly and on time, while others have to deal with delays and poor installation.
Factors like weather, location, and design can either make the process speedy and smooth or make it a headache. But no worries, we have got the fiberglass pool installation timeline, which covers the steps involved, and how fiberglass is a better choice than others.
Ready to dive in? Let’s get started.
Breaking Down the Average Fiberglass Pool Installation Timeline
The average timeline for fiberglass pool installation is 2 to 6 weeks. It might look time-consuming, but the installation of fiberglass is fastest than the rest of the pools. Here’s a complete breakdown of fiberglass installation.
Week 1: Site Prep & Excavation
The installation process starts as soon as your contractor steps in. He is most likely to begin the process by prepping your backyard for installation. This includes:
- Measuring and marking the dig site
- Bringing in heavy machinery
- Excavating the hole for your pool shell
This step in the fiberglass pool installation process takes 1 to 3 days to complete.
Week 2: Pool Shell Delivery & Placement
Once the digging process is complete, the pool shell is lowered into the excavated area using a crane. The process may take a few hours if there are no complications.
At this stage, the team will:
- Lower the fiberglass shell into position
- Start backfilling near the pool
- Add water to the pool to stabilize it
Week 3: Plumbing, Electrical Stuff
Now comes the technical part. The team installs plumbing lines, runs electrical wires, and continues the backfilling process. It will help maintain the pool level and function perfectly.
This phase can take about 3 to 5 days. One of the key fiberglass pool features is that the shell comes pre-formed with built-in steps, ledges, and a smooth gelcoat finish, which reduces the labor and material time.
Week 4–6: Decking, Fencing, and Final Touches
Here’s where it all comes together. You’re almost ready to swim! Your contractor will begin:
- Pouring concrete or installing pavers for the pool deck
- Adding fencing (required in many areas for safety)
- Final electrical connections
- Landscaping and clean-up
Depending on how customized your poolscape is, this can take 1 to 3 weeks more.
Choosing the right coping for fiberglass pools, like cantilevered concrete or stone, adds a polished edge and can impact how long this stage takes.
Optional Add-Ons and Poolside Features
If you’re planning to add elements like tanning ledges, waterfalls, lighting systems, or even a built-in spa, these features will be installed during or just after the finishing stages. These enhancements can stretch your timeline by several days to a couple of weeks, depending on their complexity.
What Can Possibly Delay the Installation?
Even though fiberglass pools are known for fast installation, a few factors can disturb the timeline:
Weather Conditions
Rain is a big deal during excavation and decking. Even a few rainy days can delay things by a week or more, especially if your yard turns into mud.
Permitting Issues
Depending on your local government, getting permits can take anywhere from a few days to a few weeks. Some places are fast, while others move at a snail’s pace.
Custom Add-Ons
Thinking about adding water features, lighting systems, tanning ledges, or an attached spa? These extras are awesome, but they can definitely extend the fiberglass pool installation timeline. Still, many homeowners say the added perks are worth it, considering the long-term benefits of fiberglass pool upgrades.
Site Access
If your backyard is hard to reach or space is limited, delivering and placing the pool shell might take more time.
Material and Labor Delays
Supply chain issues or contractor availability can also impact your schedule. A reputable pool installer will help manage and communicate these possible delays early on.
Fiberglass vs. Vinyl vs. Concrete: Time to Install Compared
Not so sure about the fiberglass? Well, let’s compare it with other popular kinds of pools:
Fiberglass Pools
- Install Time: 2–6 weeks
- Durability: 25+ years
- Maintenance: Low
- Custom Options: Limited to shell molds
Vinyl Liner Pools
- Install Time: 4–8 weeks
- Durability: 7–12 years (liners have to be replaced)
- Maintenance: Moderate
- Custom Options: Highly customizable
Concrete (Gunite) Pools
- Install Time: 8–12+ weeks
- Durability: 50+ years
- Maintenance: High (due to resurfacing)
- Custom Options: Complete customization
Verdict: If speed, smooth surfaces, and less maintenance charges are high on your list, fiberglass pools take the lead.
Fast-Track Tips to Install a Fiberglass Pool
Want to speed things up and avoid hiccups? Here’s how to take control of your project:
Tip #1: Handle Permits Early
Talk to your contractor and submit permits ASAP. The sooner you start this step, the less likely it’ll slow you down.
Tip #2: Choose an Experienced Installer
A skilled, licensed contractor will know how to avoid common setbacks. Look at reviews, ask for references, and don’t just go with the cheapest option.
Tip #3: Plan the Whole Project in Advance
If you already know you want extra landscaping, a fire pit, or outdoor lighting, plan for it in your initial timeline. Last-minute changes are a top reason fiberglass pool installations get delayed.
Tip #4: Stay updated with the Weather Forecast
Before starting your pool project, make sure to check the weather forecast. Make sure you choose a dry season to avoid rain or intense weather conditions. This can save you tons of time and frustration.
Tip #5: Choose Quality Materials
High-grade plumbing, electrical components, and decking materials can cut down on future repairs and ensure the process goes smoothly.
Fiberglass Pool Installation Process: Start to Finish
Let’s recap the fiberglass pool installation process in order:
- Design and planning (1–2 weeks)
- Permitting and approvals (1–4 weeks)
- Excavation (1–3 days)
- Shell delivery and placement (1–2 days)
- Plumbing and electrical (3–5 days)
- Decking, fencing, and final touches (1–3 weeks)
- Optional add-ons and poolside features (varies based on complexity)
All in all, your time to install a fiberglass pool will average 2–6 weeks, depending on customization and site conditions.
And with proper maintenance, the lifespan of fiberglass pool models can easily exceed 25 years, giving you decades of worry-free enjoyment.
Bottom Line
A fiberglass pool is a long-term investment. But with the right choices, you can make it a beautiful, fun, and valuable asset of your home. One of the biggest advantages of choosing a fiberglass pool is the speed of installation compared to concrete or vinyl.
Get a quote and finalize the fiberglass pool installation timeline to transform your space. Taking early assistance from a contractor will help you plan and stay organized with the timeline, giving you the perfect swimming experience.
So, ready to install a fiberglass pool and make your backyard the go-to hangout spot? Let’s get digging!